Optionality in a rail network isn’t measured by how often it’s used; it’s measured by how much worse things get on the day it’s needed.
Curiosity Blog, Sols 4995-5001: 5,000 (Martian) Days on Mars
Written by William Farrand, Senior Research Scientist, Space Science Institute Earth planning date: Friday, Aug. 28, 2026 The span of sols spanned by this blog post is noteworthy in several ways. First, Curiosity became a world-class (for Mars at least) mountaineer by passing the 1 kilometer mark of elevation from its landing site on the floor […]
Curiosity Blog, Sols 4995-5001: 5,000 (Martian) Days on Mars
Written by William Farrand, Senior Research Scientist, Space Science Institute Earth planning date: Friday, Aug. 28, 2026 The span of sols spanned by this blog post is noteworthy in several ways. First, Curiosity became a world-class (for Mars at least) mountaineer by passing the 1 kilometer mark of elevation from its landing site on the floor […]