Skip to content
Monday, September 14, 2026

VibeWire Magazine

Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything

  • About Us
    • Privacy Policy
    • Data Deletion Instructions
  • Rail
    • Navy Narrow Gauge at Pearl Harbor
    • D&RG / D&RGW Tennessee Pass Route History
    • U.S. Navy Railroad, Pearl Harbor
    • The Decline of Rail Freight in Australia: A Multifaceted Analysis
  • Amtrak Scenic Train Routes
    • The Southwest Chief
  • Telecoms
    • Why Melbourne has advantages over Sydney for Data Centre Deployment
    • Geelong and Ballarat the new Data Centre Development Opportunities?
    • Development of international subsea fibre cables for Melbourne Australia
    • Underwater cables in Red Sea damaged months after Houthis threatened to do just that
  • Space
    • How China’s Tiangong Station is Reshaping the Landscape of Space Exploration
    • Why NASA’s First Landing On The Moon in 50 Years Matters – It’s Commercial, Cryogenic & Confused
    • NASA’s Voyager 1 glitch has scientists sad yet hopeful
  • UFO
    • UFO wreckage was salvaged by British special forces in the 1980s
  • Military
    • The Royal Navy Scuttled 116 Captured U-Boats After WWII

Tag: victoria

  • Home
  • victoria
  • Page 5
Jacinta Allan Retires After 27 Years Representing Bendigo East
  • Australia
  • Breaking News

Jacinta Allan Retires After 27 Years Representing Bendigo East

  • Helen Carrie
  • August 15, 2026
  • 0

Reactions split online, with praise for her infrastructure focus and criticism over state debt, crime, and projects.

The end results of the points removal at Sth Kensington
  • Rail News
  • Train Operations
  • Transport Victoria
  • V/Line

The end results of the points removal at Sth Kensington

  • Snuffle Nose
  • August 14, 2026
  • 8

Riding up and down the mainline noticed the points removed for other operators to use a those line are now limited for Metro Tunnel Services.

Trains resume services at Euroa and Benalla stations
  • Inland Rail
  • Rail News

Trains resume services at Euroa and Benalla stations

  • Bardy Bigglesworth
  • August 14, 2026
  • 0

Inland Rail has ticked off another major milestone on the Beveridge to Albury Tranche 2 project, completing works at Benalla and Euroa stations.

AirTrunk Plots Data Centre Campus on $350m Northern Melbourne Site
  • Australia
  • Data Centre

AirTrunk Plots Data Centre Campus on $350m Northern Melbourne Site

  • Telco Analyst
  • August 10, 2026
  • 0

Security and networks operations centre offices are also included in the plans.

Victorian Poll Shows Premier Carroll Leading Preferred Leader Race
  • Australia
  • Breaking News

Victorian Poll Shows Premier Carroll Leading Preferred Leader Race

  • Helen Carrie
  • August 10, 2026
  • 1

Reactions ranged from surprise at Labor’s resilience post-leadership change to questions

The Melbourne Airport Rail Link: Promise, Cost, and Missed Alternatives
  • Breaking News
  • Rail News

The Melbourne Airport Rail Link: Promise, Cost, and Missed Alternatives

  • Bardy Bigglesworth
  • August 8, 2026
  • 1

Successive governments chose the most expensive, most prestigious option, then struggled to fund it.

From Sunday 23 August, new timetables will start on the V/Line network
  • Breaking News
  • Rail News
  • V/Line

From Sunday 23 August, new timetables will start on the V/Line network

  • Bardy Bigglesworth
  • August 8, 2026
  • 1

Some weekday services on the Traralgon and Bairnsdale lines will start and end at Flinders Street Station instead of Southern Cross Station.

Coles Plans to Offshore Hundreds of Back-Office Jobs to India via Accenture
  • Australia
  • Breaking News

Coles Plans to Offshore Hundreds of Back-Office Jobs to India via Accenture

  • Helen Carrie
  • August 7, 2026
  • 0

Critics like Senator Matt Canavan call out the irony given past job support claims.

The South Morang Data Centre Project is a key digital infrastructure development
  • Australia
  • Data Centre

The South Morang Data Centre Project is a key digital infrastructure development

  • Telco Analyst
  • August 7, 2026
  • 1

The project will form an important part of the next-generation of vital Victoria digital infrastructure that will deliver critical economic and everyday technology benefits.

GreenSquare expands into Melbourne with 240MW data centre campus
  • Australia
  • Breaking News
  • Data Centre
  • Uncategorized

GreenSquare expands into Melbourne with 240MW data centre campus

  • Telco Analyst
  • August 7, 2026
  • 0

Australian data center firm GreenSquare is proposing a new facility at 44–76 Simcock Avenue in Spotswood, Melbourne.

Posts pagination

Previous 1 … 4 5 6 … 149 Next
  • Union Pacific President Beth Whited Celebrates 37 Years with the Railroad and Announces Transition to Company Advisor
  • The Netherlands to invest 30 million in SWL at Kijfhoek
  • Union Pacific’s Big Boy 4014 Will Make Two Whistle-Stops in Colorado During Limited 2025 Excursion
  • East Lancashire Railway to hold a Western Region Weekend in April
  • Union Pacific Corporation Declares Second Quarter 2025 Dividend

Copyright © 2026 VibeWire Magazine Theme: Express News By Adore Themes.