VN10 used on 20/11/2026 Morning Service and VN17 used on return from Swan Hill
21/11-Saturday is rough one as often they use the same set on morning on evening run new loco from yard or they use the same Loco
Was sampling Journey Beyond Rails Service Overland to Adelaide!
It was nice ride on a old train that is built was for purpose for long distance rail travel!
The down leg was crowded had big tour group on board with me in Premium Red.
The food and service was exceptional they even catered for my food requirements from my previous trips.
The riding quality was okay for old train considering the Vic Rail leg of time was considerably rough riding in some sections.
The crew was attentive and very informative and advised as required on route.
I had little Shiraz Red with my lunch of Curry and rice served on board!
After a day of riding metro Adelaide’s train I rode on UP leg Red Standard
It was good ride home lot people riding the train one BJ was out for repairs
There 1x Standard Red carraige\
2x Premium Red carriages due tour group on board at the time
Matilda Buffet from the Ghan
Power Van behind 1x NR loco
On returning I saw N12 pull out obviously late for the Swan Hill run with BZN252 & BZN258 as the BZN266 was taken off!!!
Observations:
From the train window on 20/11 I can clearly see that Vic was going get very bad storm due to unsettled weather heading that way is was fast moving bands of rain, storm and wind.
As I had learnt to interpret cloud pattens and was familiar on recognising bad weather approaching and using a compass and land marks I was able from what direction, state etc.
All I say the weekend was very stormy in Vic and V/Line had few hiccups here and there due to the increment weather!!!
Services are delayed due to extreme weather at South Geelong.
RCG and SŽ-Tovorni promet moved 3.1 million tonnes of raw materials from Koper to voestalpine’s Austrian plants in 2025. Infrastructure works along the route are now forcing the operators to adapt cross-border operations.