1414 Degrees signs 1GW AI campus deal at South Australia’s Aurora Energy Precinct

Aerial view of a large modern campus with multiple white rectangular buildings arranged in blocks amid green fields and roads.

Australian thermal energy storage firm 1414 Degrees has inked a non-binding heads of agreement with an unnamed data centre developer to build an up to 1GW AI project near Port Augusta, South Australia. The phased development will kick off with a 17MW campus powered by existing grid connections, onsite solar, and battery storage.

Here’s the early information:

  • Phased Rollout – Initial 17MW campus via existing 33kV connection, expanding to 200MW anchor campus after a 275kV transmission upgrade, with a long-term path to gigawatt scale.
  • Strategic Location – The 1,580-hectare Aurora Precinct offers the unnamed operator exclusivity over a 40-hectare parcel while definitive agreements are negotiated.
  • Renewable Backbone – Site supports up to 900MW solar generation and an approved 140MW/280MWh BESS, aligning with AI’s growing power demands.
  • Tech Integration – 1414 Degrees brings silicon-based thermal storage (SiBox, SiBrick, SiNTL) to complement solar and battery systems on site.

Gigawatt-scale AI campuses will become the norm for renewable-anchored energy precincts.

Leave a Reply

Your email address will not be published. Required fields are marked *