Trains will not run between London Liverpool Street and Chingford in Essex for sixteen days in a row this summer days, as Network Rail engineers will be carrying out work to replace a bridge.
For the first time since the announcement that the line from Wigan to Bolton in Greater Manchester would be electrified, an electric train has operated…