Skip to content
Monday, April 6, 2026

VibeWire Magazine

Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything

  • About Us
    • Privacy Policy
    • Data Deletion Instructions
  • Rail
    • Navy Narrow Gauge at Pearl Harbor
    • D&RG / D&RGW Tennessee Pass Route History
    • U.S. Navy Railroad, Pearl Harbor
    • The Decline of Rail Freight in Australia: A Multifaceted Analysis
  • Amtrak Scenic Train Routes
    • The Southwest Chief
  • Telecoms
    • Why Melbourne has advantages over Sydney for Data Centre Deployment
    • Geelong and Ballarat the new Data Centre Development Opportunities?
    • Development of international subsea fibre cables for Melbourne Australia
    • Underwater cables in Red Sea damaged months after Houthis threatened to do just that
  • Space
    • How China’s Tiangong Station is Reshaping the Landscape of Space Exploration
    • Why NASA’s First Landing On The Moon in 50 Years Matters – It’s Commercial, Cryogenic & Confused
    • NASA’s Voyager 1 glitch has scientists sad yet hopeful
  • UFO
    • UFO wreckage was salvaged by British special forces in the 1980s
  • Military
    • The Royal Navy Scuttled 116 Captured U-Boats After WWII

Category: V/Line

  • Home
  • V/Line
  • Page 18
Resumption of passenger rail services between Ballarat and Geelong long overdue
  • Breaking News
  • Myki
  • Rail News
  • V/Line

Resumption of passenger rail services between Ballarat and Geelong long overdue

  • Bardy Bigglesworth
  • September 1, 2024
  • 8

For reasons unknown the government and V/Line have refused to return services for the travelling public despite requests from the Ballarat and Geelong regional councils.

Introduce a Trial Shuttle Passenger Train Service between Maryborough and Mildura
  • Breaking News
  • Rail News
  • V/Line

Introduce a Trial Shuttle Passenger Train Service between Maryborough and Mildura

  • gobstopper
  • September 1, 2024
  • 2

More than 75000 residents live in the Sunraysia and in communities along the Mildura rail line and they have not had a passenger train service since it was axed  under the Kennett government

Bairnsdale line train services just became a whole lot worse
  • Breaking News
  • Rail News
  • V/Line
  • VLocity

Bairnsdale line train services just became a whole lot worse

  • Bardy Bigglesworth
  • August 31, 2024
  • 17

In continuing to take the network back to the 1950’s a new time for the Bairnsdale Line starting September 15th 2024 will remove the final locomotive hauled services from the line.

First steps for rail trail project between Maryborough and Castlemaine
  • Myki
  • Rail News
  • Rail Trail
  • Uncategorized
  • V/Line

First steps for rail trail project between Maryborough and Castlemaine

  • Bardy Bigglesworth
  • August 30, 2024
  • 4

Member for Bendigo West, Maree Edwards, said the study has been allocated $120,000 and will examine what work needs to be done, what project could cost and what potential impacts are.

Medical report links former worker’s liver damage to diesel fumes at Melbourne’s Southern Cross Station
  • Myki
  • Rail News
  • Southern Cross Railway Station
  • V/Line

Medical report links former worker’s liver damage to diesel fumes at Melbourne’s Southern Cross Station

  • Bardy Bigglesworth
  • August 30, 2024
  • 2

“You couldn’t see across the place … it was just this hazy mess of diesel, and it wouldn’t go away,” he said.

Poor and outdated transport policy is adding to air quality issues at Southern Cross
  • Myki
  • Rail News
  • Southern Cross Railway Station
  • V/Line

Poor and outdated transport policy is adding to air quality issues at Southern Cross

  • Brian Evans
  • August 30, 2024
  • 12

We need urgent electrification of Geelong, Ballarat and a plan for Bendigo. Don’t be fooled the government is well aware of this.

Riding the upgraded Warrnambool Line on 29th August 2024
  • Rail News
  • Rail Travel
  • RailAdventure
  • Railway Blog
  • RailWorks
  • V/Line

Riding the upgraded Warrnambool Line on 29th August 2024

  • Snuffle Nose
  • August 29, 2024
  • 5

Line closed at 14th June for upgrades to 25th of August on the Warrnambool line and I decided to ride it to observe for myself the riding quality of the train.

Winter blitz complete, level crossings gone, new stations open
  • Myki
  • Rail News
  • V/Line

Winter blitz complete, level crossings gone, new stations open

  • admin
  • August 29, 2024
  • 1

The project has delivered eight kilometres of duplicated track, upgrades to Marshall and South Geelong stations.

Marshall Station upgrade
  • Breaking News
  • Myki
  • Rail News
  • V/Line

Marshall Station upgrade

  • Bardy Bigglesworth
  • August 29, 2024
  • 3

A new waiting room was built on the original platform so passengers can wait for their train in comfort.

A trip to Waurn Ponds with new rail works at South Geelong
  • Geelong
  • Myki
  • Rail News
  • V/Line

A trip to Waurn Ponds with new rail works at South Geelong

  • Brian Evans
  • August 28, 2024
  • 8

Resumption of trains on the new line upgrades, a trip from Melbourne to Waurn Ponds was in order.

Posts pagination

Previous 1 … 17 18 19 … 23 Next
  • Union Pacific President Beth Whited Celebrates 37 Years with the Railroad and Announces Transition to Company Advisor
  • Paul’s Blog – July 13, 2024
  • STG Logistics and Union Pacific Railroad Extend Long-Running Partnership to Deliver Consumer Goods
  • KTZ launches door-to-door service between Kazakhstan and Belgium

Copyright © 2026 VibeWire Magazine Theme: Express News By Adore Themes.