The fleet, equipped with Innofreight “RockTainer ORE” containers, will handle around 1.8 million tonnes of iron ore annually from the Erzberg site in Styria.
Related Posts
UIRR links energy crisis to modal shift
- gobstopper
- March 16, 2026
- 0
Logs roll onto rail in Tasmania
- Ray Chan
- January 15, 2024
- 0
Tasmania has recorded a 10-fold increase in timber logs transported on rail over the past 10 years. From a …
The post Logs roll onto rail in Tasmania appeared first on Rail Express.