The investment gives the Polish terminal two additional tracks and two new remote-controlled rail-mounted gantry cranes. The three existing tracks were extended to more than 750 metres, allowing the terminal to handle full-length freight trains without splitting them.
Related Posts
Long-awaited report into 2020 North East train derailment due soon
- gobstopper
- January 9, 2024
- 0
Tågab launches asphalt stone rail flows for Eurosand
- gobstopper
- March 11, 2026
- 0