In the airport’s preliminary draft 2026 master plan, it details the move to rename the international terminal as T1 and domestic terminal as T2, with the new terminal – located between the two parallel runways – to be dubbed T3.
Related Posts
Qantas’ direct Newcastle–Perth link gets underway
- Guest authors
- September 9, 2025
- 0
Peak airports body continues backing Virgin-Qatar Doha flights
- Guest authors
- January 16, 2025
- 0