Projects for standard gauge in Spain get going north and south

The Spanish Ministry of Transport (MITMA) recently assigned contracts for the implementation of the standard gauge (1435mm) in key rail freight locations. The projects concern the area of Valladolid in the north and the Bobadilla-Algeciras railway in the south. The Bobadilla-Algeciras line is a starting point for both the TEN-T Atlantic and Mediterranean corridors. Algeciras…

Spain starts 2024 strong with TEN-T developments

The Spanish integration of EU railway standards and the Trans-European Transport Network (TEN-T) is taking shape. The year started with some significant developments for rail freight, mostly regarding the Mediterranean and the Atlantic TEN-T corridors running through the country. In the context of the Mediterranean Corridor, the extension of various sidings to handle longer convoys […]