The first deliveries of wood chips from UPM Biochemicals have been delivered by DB Cargo to the world’s first biorefinery at Leuna in Germany.
Author: Guest authors
Vestas break US record with longest blade transport by rail
Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine […]