Bridge strike damage prompts urgent closure of A4010 near High Wycombe

Road users are being urged to plan ahead as the A4010 Bradenham Road near High Wycombe closes next week for urgent repairs to a damaged railway bridge.

The bridge has been damaged after being struck by vehicles, despite it’s warning signs and height restrictions which are clearly visible to drivers.  

It will be closed from Monday 23 November to Friday 11 December inclusive, with reopening expected on Saturday 12 December. Engineers will carry out extensive repair work to damaged brickwork on the railway bridge which carries the Chiltern main line between High Wycombe and Princes Risborough.

A full closure is needed as scaffolding and specialist equipment, including temporary structural supports, have to be used throughout and needs to be positioned within the carriageway while the work takes place. Train services will not be disrupted during the work.

Network Rail is working closely with Buckinghamshire Council on the temporary road closure, and with the nearby school and residents to help reduce the impact of it on local journeys.

Road users are advised to plan ahead, allow extra time and follow the clearly signed diversion routes which will be in place for all traffic during the closure.

Adam Checkley, engineering director at Network Rail, said: “We’re sorry for the disruption this closure will cause and understand the impact it will have on people who regularly use the A4010.

“These repairs are critical. Closing the road is the only way we can safely position the equipment needed to repair the damage caused by these bridge strikes.

“We’ll work as quickly and safely as possible to repair the bridge and reopen the road. Please allow extra time for your journey and follow the signed diversion.

“This is a reminder of why drivers of large vehicles must know their vehicle’s height and check their route before setting off to avoid unnecessary damage to bridges and the subsequent delay and disruption to local communities.”

Details of the repairs are being announced during Road Safety Week, following Network Rail’s publication of Britain’s ten most-bashed railway bridges and its renewed call for drivers and transport operators to ‘Wise Up, Size Up’.

Network Rail recorded 1,706 bridge strikes in 2025/26, equivalent to around one every five hours. The incidents caused 185,319 minutes of delays to rail passengers and cost around £13.25 million in delays, cancellations and repairs.

Drivers are being urged to know the height and width of their vehicles, check their planned route is suitable, and pay close attention to bridge height restrictions to help prevent similar incidents.

Image credit: Network Rail

Leave a Reply

Your email address will not be published. Required fields are marked *