In a post on LinkedIn, the Flying Kangaroo said fuselage sections and wings have now been joined on the aircraft, with the tail also installed this past week. It comes after the first of the new aircraft left the initial assembly line in November.
More than a dozen flights have been impacted by the eruption of Mount Lewotobi Laki-Laki on the nearby island of Flores, which has spewed volcanic ash up to 10,000 metres above its summit.