Adif has allocated €13.3m for a contract to maintain signalling equipment and systems on the La Robla-Pola de Lena high-speed rail line.
The post Adif allocates $15.4m for signalling maintenance on La Robla–Pola de Lena line appeared first on Railway Technology.