Rail traffic has resumed on one of Austria’s busiest rail sections after ÖBB completed the replacement of the Rauchmühl Bridge near Innsbruck. Around 270 trains per day are returning to the route between Hall in Tirol and Innsbruck main station.
Ammonia-Bearing Compounds Discovered at Surface of Jupiter’s Moon Europa
Description Advanced analysis of decades-old data from NASA’s Galileo spacecraft identifies ammonia-bearing compounds discovered on the surface of Jupiter’s moon Europa, as shown in this composite image. Zooming in on an area about 250 miles (about 400 kilometers) wide, the black-and-white mosaic to the right is composed of multiple images from Galileo’s Solid-State Imaging camera. […]
NASA Analysis Shows La Niña Limited Sea Level Rise in 2025
Description This graph shows the rise in global mean sea level from 1993 to 2025 based on data from a series of five international satellites. The solid red line indicates the trajectory of this increase, which has more than doubled over the three decades. The dotted red line projects future sea level rise. A NASA analysis […]