The last of more than 2,700 enormous deck segments for HS2’s Delta junction, a complex triangular network of viaducts outside Birmingham, has been manufactured at a purpose-built factory. The deck segments, which each weigh up to 85 tonnes, were made at a temporary outdoor facility alongside the M42 near Kingsbury in Warwickshire. They are then […]