The pilot runs, conducted as part of a “Waste on Rail” initiative, included material transport to a local incineration plant and confirmed the technical readiness of the solution.
The pilot runs, conducted as part of a “Waste on Rail” initiative, included material transport to a local incineration plant and confirmed the technical readiness of the solution.