The airport is almost doubling its terminal footprint from 6,100m² to 11,750m², installing two new gates, and tripling the size of the domestic departure lounge from 1,250m² to 3,750m². The works are expected to be completed in 2027.
Dubbed the “GC Surfer”, the project will use buses similar to Brisbane Metro to connect Robina to Coolangatta via Varsity Lakes, Burleigh Heads, and the Gold Coast Airport at 10-minute frequencies. It comes after the light rail extension was scrapped l…