Two Technical Reports From FRA: Concrete Railroad Ties; Visual and Automation-Aided Track Inspections

WASHINGTON, D.C. – The Federal Railroad Administration (FRA) has published two technical reports; one on the concrete railroad tie freeze-thaw durability and the other is supplemental to a previous study on track inspections.
The post Two Technical Rep…

Report: The Portal Project Advances in California

The Federal Transit Administration (FTA) has committed $3.38 billion to The Portal Project, bringing Caltrain commuter rail to San Francisco’s Salesforce Transit Center, the San Francisco Examiner reported May 11. The Transbay Joint Powers Authority (T…

MBTA Makes Progress on Red Line Trackwork; Removes 13 Speed Restrictions

BOSTON – The MBTA has made progress on its Red Line and subsequently removed 13 speed restrictions.
The post MBTA Makes Progress on Red Line Trackwork; Removes 13 Speed Restrictions appeared first on Railway Track and Structures.