Step-free access to the Thameslink platforms at London St Pancras will not be available for three months from 15th June while the llfts are refurbished.
Publicly-owned train operator LNER has revealed that it is working with clean energy infrastructure experts Treeva to pioneer a system for capturing energy from turbulent airflow adjacent to the railway and turning it into clean, renewable energy.