Skip to content
Saturday, December 6, 2025

VibeWire Magazine

Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything

  • About Us
    • Privacy Policy
    • Data Deletion Instructions
  • Rail
    • Navy Narrow Gauge at Pearl Harbor
    • D&RG / D&RGW Tennessee Pass Route History
    • U.S. Navy Railroad, Pearl Harbor
    • The Decline of Rail Freight in Australia: A Multifaceted Analysis
  • Amtrak Scenic Train Routes
    • The Southwest Chief
  • Telecoms
    • Why Melbourne has advantages over Sydney for Data Centre Deployment
    • Geelong and Ballarat the new Data Centre Development Opportunities?
    • Development of international subsea fibre cables for Melbourne Australia
    • Underwater cables in Red Sea damaged months after Houthis threatened to do just that
  • Space
    • How China’s Tiangong Station is Reshaping the Landscape of Space Exploration
    • Why NASA’s First Landing On The Moon in 50 Years Matters – It’s Commercial, Cryogenic & Confused
    • NASA’s Voyager 1 glitch has scientists sad yet hopeful
  • UFO
    • UFO wreckage was salvaged by British special forces in the 1980s
  • Military
    • The Royal Navy Scuttled 116 Captured U-Boats After WWII

Tag: Ballarat Railway Line

  • Home
  • Ballarat Railway Line
Jacinta Allan plans to shutdown key rail freight route into Melbourne
  • Australia
  • Breaking News
  • Rail News

Jacinta Allan plans to shutdown key rail freight route into Melbourne

  • Bardy Bigglesworth
  • October 5, 2025
  • 2

The Ballarat City Council has raised concerns/alarm at the Victorian State Government’s plan to remove the Ballarat to Melbourne rail freight line.

V/line disruption to Ballarat/Maryborough/Ararat Services
  • Breaking News
  • Rail News
  • V/Line

V/line disruption to Ballarat/Maryborough/Ararat Services

  • Bardy Bigglesworth
  • May 29, 2025
  • 4

There will be a series of major service outages over the coming period.

V/Line network suffers another day of service outages and cancelled trains
  • Breaking News
  • Rail News
  • V/Line

V/Line network suffers another day of service outages and cancelled trains

  • Bardy Bigglesworth
  • May 21, 2025
  • 9

This is the second day running the Ballarat Line has been largely out of service for the all important morning peak services.

Crews to hit the ground at Ballarat Station
  • Industry Infrastructure
  • Industry Safety
  • Rail industry news (Australia, New Zealand)
  • Station Design
  • Train Stations
  • V/Line

Crews to hit the ground at Ballarat Station

  • Guest authors
  • January 13, 2025
  • 4

Crews will begin site establishment from Tuesday 14 January to prepare for the start of works later this month.

Does Ballarat need more weekend trains and train extensions?
  • Breaking News
  • Myki
  • Rail News
  • V/Line

Does Ballarat need more weekend trains and train extensions?

  • Bardy Bigglesworth
  • August 26, 2024
  • 2

After a weekend of “overcrowded” trains to and from Ballarat does our timetable need a rethink?

Contracts Signed To Remove Melton Level Crossings
  • Level Crossing Removal
  • Myki
  • Rail News
  • V/Line

Contracts Signed To Remove Melton Level Crossings

  • Bardy Bigglesworth
  • August 16, 2024
  • 2

The elevated station will include an air-conditioned waiting room and staffed ticket office, along with lighting and security cameras throughout the surrounding area.

  • Cumbrian rail station to host an afternoon of festive cheer
  • Union Pacific President Beth Whited Celebrates 37 Years with the Railroad and Announces Transition to Company Advisor
  • Union Pacific Unveils Commemorative Lincoln Locomotive No. 1616 with First Trip Planned in May
  • Union Pacific Reports First Quarter 2025 Results

Copyright © 2025 VibeWire Magazine Theme: Express News By Adore Themes.