The investment gives the Polish terminal two additional tracks and two new remote-controlled rail-mounted gantry cranes. The three existing tracks were extended to more than 750 metres, allowing the terminal to handle full-length freight trains without splitting them.
Related Posts
PERN commissions new rail fuel terminal near Bydgoszcz
- gobstopper
- May 25, 2026
- 0
Forwardis simplifies single wagon logistics
- gobstopper
- June 8, 2026
- 0