Modernising an existing rail vehicle for higher-speed operation requires more than changes to the vehicle itself. The modified vehicle has to be tested, technical evidence has to be produced, operational test runs need to be organised and the documentation required for authorisation has to be completed.
Related Posts
New electric tram-trains in testing for South Wales Metro
- Guest authors
- April 17, 2025
- 0
Brand-new electric tram-trains are now being tested on the recently electrified Valleys railway lines, as TfW take another step forward with delivering the next phase of the South Wales Metro. Part of an £800 million investment into brand-new trains across Wales and the Borders, the Stadler Class 398 CITYLINK tram-trains will revolutionise transport in South […]
Transport for Wales launches ‘TfW Protect’ to help tackle cable and metal theft across the railway network
- Guest authors
- July 28, 2026
- 0
Transport for Wales (TfW) has launched TfW Protect, a dedicated anonymous reporting service designed to help tackle cable and metal theft across the rail network. Cable and metal theft remains a serious issue for the railway, often resulting in delays, cancellations and wider disruption that can prevent people from getting to work, appointments, events, and other important destinations. […]