The contracts cover the 6th of October–Alexandria corridor and the Belbes–10th of Ramadan line, with a combined value of about EUR 690m.
Related Posts
SBO rail freight rises to 1.23m tonnes in 2025
- gobstopper
- February 12, 2026
- 0
DB Schenker sale: provision to safeguard jobs the tie-breaker?
- Guest authors
- September 4, 2024
- 0