The upgrade, backed by an investment of EUR 10m, increases the terminal area to 42,000 m² and adds two 550 m tracks.
Related Posts
HS2 breaks through in Birmingham
- Guest authors
- May 12, 2025
- 0
HS2’s giant tunnelling machine Mary Ann broke through on Friday 9 May, marking the end of her mission to excavate the first bore of what will soon become the longest railway tunnel in the West Midlands. The 125-metre-long machine began constructing the 3.5-mile (5.8km) Bromford Tunnel, which starts at the Warwickshire village of Water Orton […]
- Abbey Wood
- Beaulieu Park
- Billericay
- Brentwood
- Burnham
- Burnham-on-Crouch
- Central Line
- Colchester
- Colchester Town
- Elizabeth Line
- Forest Gate
- Gidea Park
- Goodmayes
- Graffiti
- Greater Anglia
- Harold Wood
- Ilford
- Infrastructure
- Ipswich
- London
- London Liverpool Street
- Maryland
- National Rail
- Network Rail
- Norwich
- Romford
- Shenfield
- Southend Victoria
- Stratford
- Whitechapel
- Wickford
- Witham
The Great Eastern Main Line to see vital engineering work take place this February
- Guest authors
- January 25, 2024
- 0