The light aircraft, registered as VH-TKK, was diverted to RAAF Base Tindal after a total electrical failure and came within close proximity of two military aircraft on final approach using the same runway.
A new statement from administrator Hall Chadwick reveals the airline’s directors were only told they were losing control of their 737 MAXs the day before the repossessions occurred.
The contract is a key component of Boeing’s participation in the Australian government’s Global Supply Chain Program, which aims to enhance collaboration with local suppliers and strengthen the Australian defence industry.