LA Metro Releases Final EIS/EIR for Southeast Gateway Line

LOS ANGELES – The LA Metro, along with the FTA, released a final EIS and EIR for the Southeast Gateway Line, formerly known as the West Santa Ana Branch Transit Corridor.
The post LA Metro Releases Final EIS/EIR for Southeast Gateway Line appeared firs…

MDOT Maryland Transit Administration Awarded $5M for Patapsco Pedestrian Bridge

BALTIMORE – To provide better access for Cherry Hill, Brooklyn, and Lansdowne residents to public transit, the MDOT MTA was awarded $5 million for the Patapsco Pedestrian/Bicycle Bridge and trail.
The post MDOT Maryland Transit Administration Awarded $…

Brightline West Selects Atlas Technical Consultants for Geotechnical Engineering

AUSTIN, Texas – For the high-speed rail project scheduled to open in 2028, Brightline West chose Atlas Technical Consultants to handle the engineering and design.
The post Brightline West Selects Atlas Technical Consultants for Geotechnical Engineering…