Skip to content
Sunday, October 4, 2026

VibeWire Magazine

Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything

  • About Us
    • Privacy Policy
    • Data Deletion Instructions
  • Rail
    • Navy Narrow Gauge at Pearl Harbor
    • D&RG / D&RGW Tennessee Pass Route History
    • U.S. Navy Railroad, Pearl Harbor
    • The Decline of Rail Freight in Australia: A Multifaceted Analysis
  • Amtrak Scenic Train Routes
    • The Southwest Chief
  • Telecoms
    • Why Melbourne has advantages over Sydney for Data Centre Deployment
    • Geelong and Ballarat the new Data Centre Development Opportunities?
    • Development of international subsea fibre cables for Melbourne Australia
    • Underwater cables in Red Sea damaged months after Houthis threatened to do just that
  • Space
    • How China’s Tiangong Station is Reshaping the Landscape of Space Exploration
    • Why NASA’s First Landing On The Moon in 50 Years Matters – It’s Commercial, Cryogenic & Confused
    • NASA’s Voyager 1 glitch has scientists sad yet hopeful
  • UFO
    • UFO wreckage was salvaged by British special forces in the 1980s
  • Military
    • The Royal Navy Scuttled 116 Captured U-Boats After WWII

Category: Infrastructure

  • Home
  • Infrastructure
  • Page 27
  • Borders Railway
  • Disruption
  • Edinburgh
  • Infrastructure
  • Network Rail
  • Rail News
  • Stow
  • Tweedbank

Electrification makes an appearance on Borders Railway

  • Guest authors
  • August 18, 2026
  • 0

After starting electrification work on the Borders Railway in February, Network Rail engineers have now begun installing the steel masts that will support the overhead wires needed to supply power to new battery-electric trains.

  • Disruption
  • Infrastructure
  • London Charing Cross
  • London Waterloo East
  • Network Rail
  • Rail News
  • South Eastern Railway
  • Southeastern

Major London stations reopen after engineering work completed

  • Guest authors
  • August 17, 2026
  • 0

Southeastern services have resumed at London’s Charing Cross and Waterloo East after being close for 22 days for engineering work.

  • Disruption
  • Infrastructure
  • London Charing Cross
  • London Waterloo East
  • Network Rail
  • Rail News
  • South Eastern Railway
  • Southeastern

Major London stations reopen after engineering work completed

  • Guest authors
  • August 17, 2026
  • 0

Southeastern services have resumed at London’s Charing Cross and Waterloo East after being close for 22 days for engineering work.

  • Featured
  • Infrastructure
  • Permanent Way
  • Rail News
  • Rolling Stock
  • Travel
  • UK

Week-long rail disruption expected following Wickford derailment

  • Guest authors
  • August 17, 2026
  • 0

Rail passengers planning to travel through Wickford are being advised by Network Rail and Greater Anglia to expect disruption to train services for at least a week and to only travel on this route if their journey is essential. Following the derailment of one carriage of a Greater Anglia train and extensive damage to one […]

  • Infrastructure
  • Rail News
  • Railfreight

STORK starts Magdeburg container terminal earthworks

  • gobstopper
  • August 17, 2026
  • 0

The 500-metre site will add partner access to the recycling group’s rail-road handling capacity.

  • Bicester
  • Cherwell District Council
  • Infrastructure
  • Intermodal
  • Mountpark
  • Nationally Significant Infrastructure Project
  • News
  • Oxfordshire
  • Oxfordshire Railfreight Limited
  • OxSRFI
  • Rail News

Oxfordshire rail freight interchange accepted for examination

  • Simon Walton
  • August 17, 2026
  • 0

The proposed £1.5 billion (€1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.…

  • Bicester
  • Cherwell District Council
  • Infrastructure
  • Intermodal
  • Mountpark
  • Nationally Significant Infrastructure Project
  • News
  • Oxfordshire
  • Oxfordshire Railfreight Limited
  • OxSRFI
  • Rail News

Oxfordshire rail freight interchange accepted for examination

  • Simon Walton
  • August 17, 2026
  • 0

The proposed £1.5 billion (€1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.…

  • Hitachi Rail
  • Infrastructure
  • Rail News
  • Romania
  • Signalling
  • World

Hitachi Rail completes signalling installation at two stations in Romania

  • Guest authors
  • August 16, 2026
  • 0

Hitachi Rail completed the installation and commissioning of advanced signalling solutions at two railway stations in Romania.

  • Hitachi Rail
  • Infrastructure
  • Rail News
  • Romania
  • Signalling
  • World

Hitachi Rail completes signalling installation at two stations in Romania

  • Guest authors
  • August 16, 2026
  • 0

Hitachi Rail completed the installation and commissioning of advanced signalling solutions at two railway stations in Romania.

  • Hitachi Rail
  • Infrastructure
  • Rail News
  • Romania
  • Signalling
  • World

Hitachi Rail completes signalling installation at two stations in Romania

  • Guest authors
  • August 16, 2026
  • 0

Hitachi Rail completed the installation and commissioning of advanced signalling solutions at two railway stations in Romania.

Posts pagination

Previous 1 … 26 27 28 … 260 Next
  • Italian associations urge for state intervention to avoid catastrophic scenario
  • Union Pacific Reports First Quarter 2025 Results
  • Union Pacific Reports First Quarter 2025 Results
  • Union Pacific Reports First Quarter 2024 Results
  • Union Pacific Reports First Quarter 2025 Results

Copyright © 2026 VibeWire Magazine Theme: Express News By Adore Themes.