NEC cuts 5G radio power draw with compact amplifier module

NEC has engineered a compact Power Amplifier Module (PAM) designed to cut energy draw in 5G base station Radio Units. Telcos currently face rising operational expenditures associated with 5G densification. Because 5G networks utilise higher frequency b…

Severe Disruption at London Waterloo this Weekend

Half of London Waterloo Station will close this weekend, as engineering works take place between London Waterloo and Clapham Junction

Major renewal of Nunthorpe level crossing will boost safety and reliability

A full renewal of Nunthorpe level crossing is set to enhance safety for pedestrians, motorists and rail passengers. The upgrade, taking place from Sunday 22 February to Saturday 28 February, will see the life-expired crossing replaced by Network Rail. A new sliding barrier will be installed, with a modern operating system added and the road […]

Major renewal of Nunthorpe level crossing will boost safety and reliability

A full renewal of Nunthorpe level crossing is set to enhance safety for pedestrians, motorists and rail passengers. The upgrade, taking place from Sunday 22 February to Saturday 28 February, will see the life-expired crossing replaced by Network Rail. A new sliding barrier will be installed, with a modern operating system added and the road […]

Engineering work to progress East Coast Digital Programme will impact travel

Trains between London and Peterborough/King’s Lynn will be affected over the next four weekends by engineering work including further progress on digital signalling, passengers are reminded. The improvement work from this Saturday (31 January) will deliver a range of benefits – including engineering and testing under the £1.4 billion East Coast Digital Programme (ECDP), which […]

TRU wraps up a month of major upgrades transforming train travel

Transpennine Route Upgrade (TRU) teams have completed over 32 days of major upgrades between Leeds and York, helping deliver faster, greener, more frequent services across the North. The work delivered by an army of hundreds of people includes 70 new signals installed and made operational, 3km of track renewed, along with eleven switches and crossings. […]