Trike run at Ladysmith

 Trike rides at LadysmithFebruary 11th saw the resumption of Trike rides for the public at Ladysmith. The first trike about to depart the loading area after the opening. The goods shed is in the background.  The fencing is new, and a req…

Back Creek Junction and the line to Cowra, developments at Lambing Flat, 2012.

Once Lambing Flat was re-erected in its current home in 2003, other than maintenance and the addition of the occasional minor detail, nothing much changed, other than the addition of DCC and more rolling stock. The track plan was as shown belo…