Cranbourne line trains were more likely to be cancelled or cut short in the first eight months of the Metro Tunnel timetable than during the same period a year earlier, according to the State Government’s operational performance statistics.
“It’s actually a looping train that will connect in at Ararat, but it will go through the Wimmera region, stop in Ararat, and then go up to Mildura,” she said.
Due for completion in 2030, Stage 1 will enable more trains, more often on the Geelong, Ballarat and Bendigo lines, and pave the way for future electrification of the Melton and Wyndham Vale Lines.
Emergency services responded to the rail crossing at the intersection of Goode and Otc Roads after a truck collided with a train about 2.15pm on Tuesday 20 October.
If re-elected next month, Mr Carroll said a Labor government would introduce the $30-a-week fare cap, which would run for two years until December 2028.