Hupac and TPNOVA have officially opened the Combiconnect Barcelona terminal at La Llagosta. The facility has four 700-metre tracks and capacity for up to 130,000 loading units.
Traffic on the Omarska–Zenica route stopped on 2 March 2026 after Nova Ljubija notified the railway on 27 February that shipments were being suspended due to operational problems at the Zenica steelworks.
Traffic on the Omarska–Zenica route stopped on 2 March 2026 after Nova Ljubija notified the railway on 27 February that shipments were being suspended due to operational problems at the Zenica steelworks.