One of the boxes to tick on the Peco epic (I must settle on a name) was to make it generic and yet as un-generic as possible; and that it would use the brace of FR RTR that is now available. One of my pet peeves is the current crop of w…
Still quiet hereabouts and for good reason. The main is the finishing of the Peco epic (of which more later) but also for the finishing and testing of the arm-twist 009 layout Seething. This built purely to fulfil the wishes of Mrs. F. and thereb…
Been busy. Actually, been busy slimming down in several different ways much of which is another story. The main thrust has been trying to get Trefach finished on schedule, which hasn’t been easy; a lot of time-hungry walling, fencing and building…