Occupation bridge weight loss


 The B layout. With the A layout reaching an approximation of completeness it was time to start getting a few corners in place on the RM epic. Lumpy narrow gauge layouts need a lot more planning as there are more verticals to play with. This isn’t particularly drastic, but there are gauging jobs.

 The first here was to check the swing of a Peco Bowsider coach and judge the minimum width needed. 40mm is super tight so 50 was taken as a compromise. Likewise while the FR coach would go under if I joggled everything up a smidge, I wanted a Bachmann Baldwin to be able to be factored in, so a 7mm lift was added to the foot using the scrap wings. All painted up and enough to gauge the scenery around it.

Leave a Reply

Your email address will not be published. Required fields are marked *

This website stores cookies on your computer. These cookies are used to provide a more personalized experience and to track your whereabouts around our website in compliance with the European General Data Protection Regulation. If you decide to to opt-out of any future tracking, a cookie will be setup in your browser to remember this choice for one year.

Accept or Deny