TX Logistik has increased the frequency of its Frövi–Castelguelfo freight connection from one to two weekly departures. The roughly 2,500 km route, operated for Nurminen Logistics, is the longest continuous corridor in TX Logistik’s European network.
Related Posts
Rail groups call for ETS rail funding
- gobstopper
- July 15, 2026
- 0
Australia’s A$70 billion rail construction pipeline
- gobstopper
- February 28, 2024
- 0
Hupac CEO to Step Down in May 2026
- Guest authors
- January 27, 2026
- 0