Traffic on the Omarska–Zenica route stopped on 2 March 2026 after Nova Ljubija notified the railway on 27 February that shipments were being suspended due to operational problems at the Zenica steelworks.
The Bergen Line covers 461 km via Roa (483 km via Drammen) and is considered one of Norway’s most resilient freight corridors due to challenging mountain conditions that limit road transport reliability.
Six major rail freight operators have signed an agreement to launch “Track Together,” a mutual-aid operational scheme designed to reduce congestion on the Port Railway Line in Rotterdam.