Skip to content
Saturday, December 6, 2025

VibeWire Magazine

Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything

  • About Us
    • Privacy Policy
    • Data Deletion Instructions
  • Rail
    • Navy Narrow Gauge at Pearl Harbor
    • D&RG / D&RGW Tennessee Pass Route History
    • U.S. Navy Railroad, Pearl Harbor
    • The Decline of Rail Freight in Australia: A Multifaceted Analysis
  • Amtrak Scenic Train Routes
    • The Southwest Chief
  • Telecoms
    • Why Melbourne has advantages over Sydney for Data Centre Deployment
    • Geelong and Ballarat the new Data Centre Development Opportunities?
    • Development of international subsea fibre cables for Melbourne Australia
    • Underwater cables in Red Sea damaged months after Houthis threatened to do just that
  • Space
    • How China’s Tiangong Station is Reshaping the Landscape of Space Exploration
    • Why NASA’s First Landing On The Moon in 50 Years Matters – It’s Commercial, Cryogenic & Confused
    • NASA’s Voyager 1 glitch has scientists sad yet hopeful
  • UFO
    • UFO wreckage was salvaged by British special forces in the 1980s
  • Military
    • The Royal Navy Scuttled 116 Captured U-Boats After WWII

Category: Level Crossing Removal

  • Home
  • Level Crossing Removal
  • Page 7
  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • Track Construction
  • Train Stations
  • Tunnelling

Victoria’s Big Build to continue through winter

  • Guest authors
  • May 30, 2024
  • 0
Image/Victoria’s Big Build

This winter Victoria‘s Big Build works progress on major rail projects, including removing level crossings and opening new stations that …

The post Victoria’s Big Build to continue through winter appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • Track Construction
  • Train Stations

Winter blitz to complete southwest works

  • Guest authors
  • May 29, 2024
  • 0
Image/Victoria’s Big Build

A massive construction blitz this winter will complete major construction of the South Geelong to Waurn Ponds Duplication and level …

The post Winter blitz to complete southwest works appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • Track Construction
  • Train Stations

Winter works heat up in Melbourne’s outer east

  • Guest authors
  • May 27, 2024
  • 0
Image/Victoria’s Big Build

The final push to make the Lilydale Line Melbourne’s first level crossing free rail line has kicked off, with construction …

The post Winter works heat up in Melbourne’s outer east appeared first on Rail Express.

Ringwood East residents wave goodbye to troubled train station
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • Railway Stations

Ringwood East residents wave goodbye to troubled train station

  • Bardy Bigglesworth
  • May 24, 2024
  • 0

A group of trainspotters of a different kind are gathering at an eastern suburbs railway station tonight to say goodbye to almost 100 years of service before it’s demolished.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • Track Construction

Designs released for Melton and Truganina

  • Guest authors
  • May 24, 2024
  • 0
Image/Victoria’s Big Build

Early designs have been released for two more level crossing removals in Melbourne’s booming west, to make Melton boom gate-free by …

The post Designs released for Melton and Truganina appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)

Crews set up site for Diggers Rest level crossing removals

  • Guest authors
  • May 24, 2024
  • 0
Image/Victoria’s Big Build

Construction to make Diggers Rest level crossing free will start soon, with crews preparing for early works at Old Calder Highway …

The post Crews set up site for Diggers Rest level crossing removals appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • Track Construction

Fyans Street bridge takes shape

  • Guest authors
  • May 23, 2024
  • 0
Image/Victoria’s Big Build

The eight piers that will support the new Fyans Street rail bridge have been installed, as work continues on construction …

The post Fyans Street bridge takes shape appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)

Brunt Road boom gates removed

  • Guest authors
  • May 22, 2024
  • 0
Image/Inland Rail

The boom gates at Brunt Road in Beaconsfield have been removed following the opening of the new Brunt Road bridge in April …

The post Brunt Road boom gates removed appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • State
  • Track Construction
  • Train Stations

Marshall overpass moves into place

  • Guest authors
  • May 20, 2024
  • 0
Image/Victoria’s Big Build

The upgrades at Marshall Station have taken another step towards completion, with the new accessible pedestrian overpass now in place. …

The post Marshall overpass moves into place appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • Train Stations

77 level crossings gone as Keon Parade reopens

  • Guest authors
  • May 17, 2024
  • 0
Image/Victoria’s Big Build

The boom gates at Keon Parade in Reservoir are now a thing of the past, as Melbourne’s 77th dangerous and congested level crossing …

The post 77 level crossings gone as Keon Parade reopens appeared first on Rail Express.

Posts pagination

Previous 1 … 6 7 8 … 12 Next
  • Union Pacific’s Famed ‘Big Boy’ Steam Engine to Visit Dozens of Communities in Upcoming Tour
  • Union Pacific’s Famed ‘Big Boy No. 4014’ Preparing for Westward Summer Tour
  • Union Pacific Reports Second Quarter 2024 Results
  • Welsh Steel Works to introduce replacement for Class 08 locomotives

Copyright © 2025 VibeWire Magazine Theme: Express News By Adore Themes.