TORONTO – One tunnel boring machine (TBM) excavating for the western underground segment of the Eglinton Crosstown West Extension has broken through the final wall.
The post WATCH: ‘Rexy’, One of Two TBMs for the Eglinton Crosstown West Extension, Brea…
Category: tunnel boring machine (TBM)
IO and Metrolinx Award $255M Contract for Eglinton Crosstown West Extension Design & Build
ONTARIO – STRABAG Inc. was awarded the $255 million contract to for the second underground segment of the extension.
The post IO and Metrolinx Award $255M Contract for Eglinton Crosstown West Extension Design & Build appeared first on Railway Track…