Skip to content
Monday, November 2, 2026

VibeWire Magazine

Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything

  • About Us
    • Privacy Policy
    • Data Deletion Instructions
  • Rail
    • Navy Narrow Gauge at Pearl Harbor
    • D&RG / D&RGW Tennessee Pass Route History
    • U.S. Navy Railroad, Pearl Harbor
    • The Decline of Rail Freight in Australia: A Multifaceted Analysis
  • Amtrak Scenic Train Routes
    • The Southwest Chief
  • Telecoms
    • Why Melbourne has advantages over Sydney for Data Centre Deployment
    • Geelong and Ballarat the new Data Centre Development Opportunities?
    • Development of international subsea fibre cables for Melbourne Australia
    • Underwater cables in Red Sea damaged months after Houthis threatened to do just that
  • Space
    • How China’s Tiangong Station is Reshaping the Landscape of Space Exploration
    • Why NASA’s First Landing On The Moon in 50 Years Matters – It’s Commercial, Cryogenic & Confused
    • NASA’s Voyager 1 glitch has scientists sad yet hopeful
  • UFO
    • UFO wreckage was salvaged by British special forces in the 1980s
  • Military
    • The Royal Navy Scuttled 116 Captured U-Boats After WWII

Category: Auscision

  • Home
  • Auscision
  • Page 2
  • Auscision
  • benchwork
  • Fast Tracks
  • HO Layout

FastTracks – turnout construction

  • Guest authors
  • January 31, 2025
  • 0

 My experience with Fast Tracks.A “down” QUBE steel train approaches Shepherds on Jan 30, 2025 at around 80-90Kph.  This snapshot through the car windscreen.  Of note is the lack of wires on the lineside poles – these copper wires have b…

  • Auscision
  • benchwork
  • Fast Tracks
  • HO Layout

FastTracks – turnout construction

  • Guest authors
  • January 31, 2025
  • 0

 My experience with Fast Tracks.A “down” QUBE steel train approaches Shepherds on Jan 30, 2025 at around 80-90Kph.  This snapshot through the car windscreen.  Of note is the lack of wires on the lineside poles – these copper wires have b…

  • Auscision
  • benchwork
  • Fast Tracks
  • HO Layout

FastTracks – turnout construction

  • Guest authors
  • January 31, 2025
  • 0

 My experience with Fast Tracks.A “down” QUBE steel train approaches Shepherds on Jan 30, 2025 at around 80-90Kph.  This snapshot through the car windscreen.  Of note is the lack of wires on the lineside poles – these copper wires have b…

  • Auscision
  • benchwork
  • Fast Tracks
  • HO Layout

FastTracks – turnout construction

  • Guest authors
  • January 31, 2025
  • 0

 My experience with Fast Tracks.A “down” QUBE steel train approaches Shepherds on Jan 30, 2025 at around 80-90Kph.  This snapshot through the car windscreen.  Of note is the lack of wires on the lineside poles – these copper wires have b…

  • Auscision
  • benchwork
  • Fast Tracks
  • HO Layout

FastTracks – turnout construction

  • Guest authors
  • January 31, 2025
  • 0

 My experience with Fast Tracks.A “down” QUBE steel train approaches Shepherds on Jan 30, 2025 at around 80-90Kph.  This snapshot through the car windscreen.  Of note is the lack of wires on the lineside poles – these copper wires have b…

  • Auscision
  • benchwork
  • Fast Tracks
  • HO Layout

FastTracks – turnout construction

  • Guest authors
  • January 31, 2025
  • 0

 My experience with Fast Tracks.A “down” QUBE steel train approaches Shepherds on Jan 30, 2025 at around 80-90Kph.  This snapshot through the car windscreen.  Of note is the lack of wires on the lineside poles – these copper wires have b…

  • Auscision
  • benchwork
  • Fast Tracks
  • HO Layout

FastTracks – turnout construction

  • Guest authors
  • January 31, 2025
  • 0

 My experience with Fast Tracks.A “down” QUBE steel train approaches Shepherds on Jan 30, 2025 at around 80-90Kph.  This snapshot through the car windscreen.  Of note is the lack of wires on the lineside poles – these copper wires have b…

  • Auscision
  • benchwork
  • Fast Tracks
  • HO Layout

FastTracks – turnout construction

  • Guest authors
  • January 31, 2025
  • 0

 My experience with Fast Tracks.A “down” QUBE steel train approaches Shepherds on Jan 30, 2025 at around 80-90Kph.  This snapshot through the car windscreen.  Of note is the lack of wires on the lineside poles – these copper wires have b…

  • Auscision
  • Ian Black
  • Southern Aurora Train
  • Trainbuilder
  • Wagga Wagga

Southern Aurora – Prototype, and models

  • Guest authors
  • April 15, 2024
  • 0

 The
Southern Aurora  train

 The parcel van end of the Southern Aurora heads south across the Edward Street level crossing in Wagga. The train was running very late when Ian McIlwain captured this photo in 1962. Note the illuminated sig…

The ‘modern era’ comes to Lambing Flat: Bogie rolling stock
  • Auscision
  • bogie exchange
  • containers
  • diesel era
  • Eureka
  • goods wagons
  • Lambing Flat
  • NSWGR
  • On Track Models
  • quick weathering.
  • SDS Models

The ‘modern era’ comes to Lambing Flat: Bogie rolling stock

  • Guest authors
  • July 31, 2017
  • 0

The Indian red diesels need something to haul, so, thanks to all the lovely r-t-r 1960s/1970s bogie rolling stock now available, it is a simple matter of pulling something out of the box, checking the couplings and wheels against the standards gauge, …

Posts pagination

Previous 1 2
  • Union Pacific Corporation Declares Second Quarter 2025 Dividend
  • Union Pacific Corporation Declares Second Quarter 2025 Dividend
  • Union Pacific’s Big Boy 4014 Will Make Two Whistle-Stops in Colorado During Limited 2025 Excursion
  • Union Pacific’s Big Boy No. 4014 to Steam Across 10 Midwestern and Southern States in Fall Tour
  • Union Pacific Unveils Commemorative Lincoln Locomotive No. 1616 with First Trip Planned in May

Copyright © 2026 VibeWire Magazine Theme: Express News By Adore Themes.