Chilworth Gatwick Airport Gomshall Guildford Infrastructure Level Crossing Network Network Rail North Downs Line Rail News Reigate Shalford Signalling Surrey Network Rail to Install 16 Sets of Signals on North Downs Line Guest authors June 22, 2025 0 From the 14th September to the 27th September, Network Rail will be installing 16 sets of signals between Shalford and Gomshall.
Gatwick Airport Guildford Infrastructure Network Network Rail North Downs Line Rail News Shalford Surrey North Downs Rail Line to close for 16 days Guest authors January 31, 2025 0 The North Downs Line between Guildford and Gatwick Airport is to be closed for the next 16 days because of engineering work near Shalford in Surrey.