Brightline West Selects Atlas Technical Consultants for Geotechnical Engineering

AUSTIN, Texas – For the high-speed rail project scheduled to open in 2028, Brightline West chose Atlas Technical Consultants to handle the engineering and design.
The post Brightline West Selects Atlas Technical Consultants for Geotechnical Engineering…