The revised schedule and budget follow a redesign of the tunnel’s railway systems, including a decision to turn the exploratory tunnel into a permanent maintenance and service tunnel.
The Czech Rail Authority has identified inconsistencies in ETCS installations while reporting that signal-passed-at-danger incidents remain close to pre-2023 levels. At the same time, the number of significant railway accidents fell to its lowest level…
The Czech Rail Authority has identified inconsistencies in ETCS installations while reporting that signal-passed-at-danger incidents remain close to pre-2023 levels. At the same time, the number of significant railway accidents fell to its lowest level…