Skip to content
Saturday, December 6, 2025

VibeWire Magazine

Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything

  • About Us
    • Privacy Policy
    • Data Deletion Instructions
  • Rail
    • Navy Narrow Gauge at Pearl Harbor
    • D&RG / D&RGW Tennessee Pass Route History
    • U.S. Navy Railroad, Pearl Harbor
    • The Decline of Rail Freight in Australia: A Multifaceted Analysis
  • Amtrak Scenic Train Routes
    • The Southwest Chief
  • Telecoms
    • Why Melbourne has advantages over Sydney for Data Centre Deployment
    • Geelong and Ballarat the new Data Centre Development Opportunities?
    • Development of international subsea fibre cables for Melbourne Australia
    • Underwater cables in Red Sea damaged months after Houthis threatened to do just that
  • Space
    • How China’s Tiangong Station is Reshaping the Landscape of Space Exploration
    • Why NASA’s First Landing On The Moon in 50 Years Matters – It’s Commercial, Cryogenic & Confused
    • NASA’s Voyager 1 glitch has scientists sad yet hopeful
  • UFO
    • UFO wreckage was salvaged by British special forces in the 1980s
  • Military
    • The Royal Navy Scuttled 116 Captured U-Boats After WWII

Category: Level Crossing Removal

  • Home
  • Level Crossing Removal
  • Page 9
  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • State

76th Level Crossing Removed One Year Ahead Of Schedule

  • Guest authors
  • April 26, 2024
  • 0

The Victorian Government has removed a dangerous level crossing at Brunt Road in Beaconsfield – making it the 76th level …

The post 76th Level Crossing Removed One Year Ahead Of Schedule appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • State

76th Level Crossing Removed One Year Ahead Of Schedule

  • Guest authors
  • April 26, 2024
  • 0

The Victorian Government has removed a dangerous level crossing at Brunt Road in Beaconsfield – making it the 76th level …

The post 76th Level Crossing Removed One Year Ahead Of Schedule appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • State

76th Level Crossing Removed One Year Ahead Of Schedule

  • Guest authors
  • April 26, 2024
  • 0

The Victorian Government has removed a dangerous level crossing at Brunt Road in Beaconsfield – making it the 76th level …

The post 76th Level Crossing Removed One Year Ahead Of Schedule appeared first on Rail Express.

  • Government
  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • State
  • Train Stations

Boom gates to go and new stations to open in Pakenham

  • Guest authors
  • April 23, 2024
  • 0

Three sets of boom gates will be gone, and two new stations will open in Pakenham this winter. Work is …

The post Boom gates to go and new stations to open in Pakenham appeared first on Rail Express.

Seven level crossings to go this winter
  • Australia
  • Level Crossing Removal
  • News and Opinion
  • Rail industry news (Australia, New Zealand)

Seven level crossings to go this winter

  • gobstopper
  • April 23, 2024
  • 0

A massive construction blitz over the winter months will see 7 dangerous and congested level crossings gone for good, and Melbourne will get its first […]

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • Track Construction
  • Train Stations

Winter work blitz coming for Victoria

  • Guest authors
  • April 23, 2024
  • 0

The Victorian Government is charging ahead with a winter blitz of works to complete more than $1 billion of road …

The post Winter work blitz coming for Victoria appeared first on Rail Express.

  • Government
  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • State
  • Train Stations

Designs unveiled for Officer

  • Guest authors
  • April 18, 2024
  • 0

Designs have been released for the closure of the level crossing at Station Street, Officer, which include a new pedestrian and …

The post Designs unveiled for Officer appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • State

Brunt Road closed to finish new road bridge

  • Guest authors
  • April 16, 2024
  • 0

The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with Brunt …

The post Brunt Road closed to finish new road bridge appeared first on Rail Express.

  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • State
  • Track Construction
  • Train Stations

All signs point to Pakenham

  • Guest authors
  • April 4, 2024
  • 0

Works have been progressing well on site, as crews work to remove three level crossings at McGregor Road, Main Street and Racecourse Road and …

The post All signs point to Pakenham appeared first on Rail Express.

  • Government
  • Industry Infrastructure
  • Level Crossing Removal
  • Rail industry news (Australia, New Zealand)
  • State
  • Track Construction

Geelong level crossing removal gets underway

  • Guest authors
  • April 4, 2024
  • 0

Work is underway to assemble the massive rail bridge needed to remove the Fyans Street level crossing later this year. …

The post Geelong level crossing removal gets underway appeared first on Rail Express.

Posts pagination

Previous 1 … 8 9 10 … 12 Next
  • Union Pacific’s Famed ‘Big Boy’ Steam Engine to Visit Dozens of Communities in Upcoming Tour
  • Union Pacific’s Famed ‘Big Boy No. 4014’ Preparing for Westward Summer Tour
  • Union Pacific Reports Second Quarter 2024 Results
  • Welsh Steel Works to introduce replacement for Class 08 locomotives

Copyright © 2025 VibeWire Magazine Theme: Express News By Adore Themes.