The contract will start in July 2026 and may run for up to 15 years.
Category: passenger rail
The case for the Tennyson rail line

With South East Queensland in the midst of a number of rail works, calls have been made to reopen the Tennyson train line that was closed to passenger services more than 13 years ago. The Corinda–Yeerongpilly line (also known as the Tennyson line) was closed to passenger use and has been used only by freight trains […]
The post The case for the Tennyson rail line appeared first on Rail Express.
Aptella: How technology can provide better insight into track temperature

While track temperature is a well known parameter when it comes to establishing the limits of a network, actually measuring it and reporting it can be anything but simple. It is something that has been monitored almost as long as track has existed. But is it being done right? Aptella is the local distributor of […]
The post Aptella: How technology can provide better insight into track temperature appeared first on Rail Express.