The service will operate with an initial frequency of two trains per week in both directions, enhancing connectivity of Slovakian terminal with Polish Baltic ports.
The service will operate with an initial frequency of two trains per week in both directions, enhancing connectivity of Slovakian terminal with Polish Baltic ports.
The fleet, equipped with Innofreight “RockTainer ORE” containers, will handle around 1.8 million tonnes of iron ore annually from the Erzberg site in Styria.
The fleet, equipped with Innofreight “RockTainer ORE” containers, will handle around 1.8 million tonnes of iron ore annually from the Erzberg site in Styria.