{"id":9216,"date":"2024-02-07T07:41:40","date_gmt":"2024-02-06T21:41:40","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=115257"},"modified":"2024-02-07T07:41:40","modified_gmt":"2024-02-06T21:41:40","slug":"tracks-reopen-after-extensive-closures-in-brisbane","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=9216","title":{"rendered":"Tracks reopen after extensive closures in Brisbane"},"content":{"rendered":"<p><strong>In what were the biggest track closures to date for <a href=\"https:\/\/crossriverrail.qld.gov.au\/\">Cross River Rail<\/a>, a huge amount of critical work was able to take place with approximately 500 workers involved on sites both north and south of the city.<\/strong><span id=\"more-115257\"><\/span><\/p>\n<p>Old tracks were removed and new tracks installed, track heights were raised, layouts were realigned and materials were delivered and installed over track paths as part of station rebuilds.<\/p>\n<p><a href=\"https:\/\/www.railexpress.com.au\/mammoth-task-from-cross-river-rail-crews\/\">Cross River Rail<\/a> Delivery Authority CEO Graeme Newton said the works could not have been completed safely or effectively while trains were operating.<\/p>\n<p>\u201cThe track closures have allowed crews to undertake an incredible amount of work safely and efficiently in the rail corridor,\u201d Newton said.<\/p>\n<p>\u201cWhile the work was deliberately scheduled during the quietest time of the year, we do appreciate some people had to change how they got around during this time.<\/p>\n<p>\u201cWe thank everyone for their patience while this critical work was carried out.<\/p>\n<p>\u201cThank you also to the roughly 500 workers who gave up time with loved ones during the festive period to ensure the works were a success.\u201d<\/p>\n<p>The works included the removal of 850 metres of \u201cballoon loop\u201d at Mayne Yard stabling facility, which has been seamlessly replaced by a new shunt neck to allow trains to switch lines and is already in use.<\/p>\n<p>The installation of the new shunt neck is a significant milestone for the structure of the South East Queensland rail network, with the previous balloon loop used to turn trains around on to other lines since the early 1900s.<\/p>\n<p>At Dutton Park, the final two sections of the station\u2019s pedestrian overpass were lifted into place.<\/p>\n<p>The segments weighed in at a combined 45 tonnes.<\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/tracks-reopen-after-extensive-closures-in-brisbane\/\">Tracks reopen after extensive closures in Brisbane<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In what were the biggest track closures to date for Cross River Rail, a huge amount of critical work was \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/tracks-reopen-after-extensive-closures-in-brisbane\/\">Tracks reopen after extensive closures in Brisbane<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,163,58],"tags":[],"class_list":["post-9216","post","type-post","status-publish","format-standard","hentry","category-industry-infrastructure","category-rail-industry-news-australia-new-zealand","category-track-construction"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"In what were the biggest track closures to date for Cross River Rail, a huge amount of critical work was \u2026 The post Tracks reopen after extensive closures in Brisbane appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=9216\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Tracks reopen after extensive closures in Brisbane - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"In what were the biggest track closures to date for Cross River Rail, a huge amount of critical work was \u2026 The post Tracks reopen after extensive closures in Brisbane appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=9216\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-02-06T21:41:40+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-02-06T21:41:40+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Tracks reopen after extensive closures in Brisbane - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"In what were the biggest track closures to date for Cross River Rail, a huge amount of critical work was \u2026 The post Tracks reopen after extensive closures in Brisbane appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216#blogposting\",\"name\":\"Tracks reopen after extensive closures in Brisbane - VibeWire Magazine\",\"headline\":\"Tracks reopen after extensive closures in Brisbane\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-02-07T07:41:40+10:00\",\"dateModified\":\"2024-02-07T07:41:40+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216#webpage\"},\"articleSection\":\"Industry Infrastructure, Rail industry news (Australia, New Zealand), Track Construction\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"position\":2,\"name\":\"Track Construction\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216#listItem\",\"name\":\"Tracks reopen after extensive closures in Brisbane\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216#listItem\",\"position\":3,\"name\":\"Tracks reopen after extensive closures in Brisbane\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216\",\"name\":\"Tracks reopen after extensive closures in Brisbane - VibeWire Magazine\",\"description\":\"In what were the biggest track closures to date for Cross River Rail, a huge amount of critical work was \\u2026 The post Tracks reopen after extensive closures in Brisbane appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=9216#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2024-02-07T07:41:40+10:00\",\"dateModified\":\"2024-02-07T07:41:40+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Tracks reopen after extensive closures in Brisbane - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Tracks reopen after extensive closures in Brisbane - VibeWire Magazine","description":"In what were the biggest track closures to date for Cross River Rail, a huge amount of critical work was \u2026 The post Tracks reopen after extensive closures in Brisbane appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=9216","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=9216#blogposting","name":"Tracks reopen after extensive closures in Brisbane - VibeWire Magazine","headline":"Tracks reopen after extensive closures in Brisbane","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-02-07T07:41:40+10:00","dateModified":"2024-02-07T07:41:40+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=9216#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=9216#webpage"},"articleSection":"Industry Infrastructure, Rail industry news (Australia, New Zealand), Track Construction"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=9216#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","position":2,"name":"Track Construction","item":"https:\/\/www.vibewire.com.au\/?cat=58","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=9216#listItem","name":"Tracks reopen after extensive closures in Brisbane"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=9216#listItem","position":3,"name":"Tracks reopen after extensive closures in Brisbane","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=9216\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=9216\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=9216#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=9216#webpage","url":"https:\/\/www.vibewire.com.au\/?p=9216","name":"Tracks reopen after extensive closures in Brisbane - VibeWire Magazine","description":"In what were the biggest track closures to date for Cross River Rail, a huge amount of critical work was \u2026 The post Tracks reopen after extensive closures in Brisbane appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=9216#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2024-02-07T07:41:40+10:00","dateModified":"2024-02-07T07:41:40+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Tracks reopen after extensive closures in Brisbane - VibeWire Magazine","og:description":"In what were the biggest track closures to date for Cross River Rail, a huge amount of critical work was \u2026 The post Tracks reopen after extensive closures in Brisbane appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=9216","article:published_time":"2024-02-06T21:41:40+00:00","article:modified_time":"2024-02-06T21:41:40+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Tracks reopen after extensive closures in Brisbane - VibeWire Magazine","twitter:description":"In what were the biggest track closures to date for Cross River Rail, a huge amount of critical work was \u2026 The post Tracks reopen after extensive closures in Brisbane appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"9216","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-21 02:18:34","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-02-06 22:23:30","updated":"2026-05-21 02:18:34"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=58\" title=\"Track Construction\">Track Construction<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tTracks reopen after extensive closures in Brisbane\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Track Construction","link":"https:\/\/www.vibewire.com.au\/?cat=58"},{"label":"Tracks reopen after extensive closures in Brisbane","link":"https:\/\/www.vibewire.com.au\/?p=9216"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/9216","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=9216"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/9216\/revisions"}],"predecessor-version":[{"id":9217,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/9216\/revisions\/9217"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=9216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=9216"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=9216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}