{"id":8969,"date":"2024-02-06T18:02:00","date_gmt":"2024-02-06T08:02:00","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=63074ffe9aa557957dd2630a6b115f15"},"modified":"2024-02-06T18:02:00","modified_gmt":"2024-02-06T08:02:00","slug":"half-term-disruption-for-hampshire-rail-passengers","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=8969","title":{"rendered":"Half Term Disruption for Hampshire Rail Passengers"},"content":{"rendered":"<p><img width=\"1170\" height=\"658\" src=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/02\/Fareham-landslip-work-completed.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"Fareham landslip - work completed\" style=\"display: block; margin: auto; margin-bottom: 10px; max-width: 100%;\" decoding=\"async\" fetchpriority=\"high\" \/>Passengers travelling between Eastleigh and Fareham face another week of disruption next week, following last week&#8217;s suspension for stabilisation work.\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Passengers travelling between Eastleigh and Fareham face another week of disruption next week, following last week&#8217;s suspension for stabilisation work.\u00a0<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[3476,3477,3478,2438,2314,2439,3479,2336,2306,2422,3480,2441,3481,2442,3482,343,759,2354,2443,113,3483,2444,2445,3484,2428,1684,3485,2337,2446,3486,3165,3487],"tags":[],"class_list":["post-8969","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bitterne","category-bursledon","category-cosham","category-eastleigh","category-essex","category-fareham","category-fratton","category-govia-thameslink-railway","category-great-western-railway","category-half-term","category-hamble","category-hampshire","category-havant","category-hedge-end","category-hilsea","category-infrastructure","category-london","category-london-waterloo","category-netley","category-network-rail","category-portchester","category-portsmouth","category-portsmouth-harbour","category-sholing","category-south-western-railway","category-southampton","category-southampton-central","category-southern","category-st-denys","category-swanwick","category-thameslink","category-woolston"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/8969","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8969"}],"version-history":[{"count":3,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/8969\/revisions"}],"predecessor-version":[{"id":9019,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/8969\/revisions\/9019"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8969"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8969"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8969"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}