{"id":85354,"date":"2024-07-12T08:26:34","date_gmt":"2024-07-11T22:26:34","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=116832"},"modified":"2024-07-12T08:26:34","modified_gmt":"2024-07-11T22:26:34","slug":"level-crossing-upgrades-complete-for-colac","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=85354","title":{"rendered":"Level crossing upgrades complete for Colac"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/07\/RRR_GELU_Colac-LX.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<div id=\"component_876976\">\n<div>\n<div>\n<p><strong>Level crossings in and around Colac have received an upgrade to prepare for the introduction of modern and accessible <a href=\"https:\/\/www.railexpress.com.au\/manufacturing-begins-on-new-vlocity-trains\/\">VLocity<\/a> trains.<\/strong><\/p>\n<p><span id=\"more-116832\"><\/span><\/div>\n<div>\n<p>Ten crossings in the Colac area have been upgraded as part of <a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/warrnambool-line-upgrade\">Stage 2<\/a> of the Warrnambool Line Upgrade.<\/p>\n<\/div>\n<div>\n<p>More than 20 crew members worked to upgrade train detection technology at the level crossings since construction in the area began last year.<\/p>\n<\/div>\n<div>\n<p>Axle counters &#8211; required to make the crossings compatible with VLocity trains &#8211; were installed at each site, with work including trenching and cabling.<\/p>\n<\/div>\n<div>\n<p>Crossings at Larpent and Warrowie roads received an added safety boost with the installation of boom gates, lights and bells.<\/p>\n<\/div>\n<div>\n<p>Similar upgrades were completed at the Deans Creek Road level crossing as part of the first stage of upgrades to the Warrnambool Line in 2020.<\/p>\n<\/div>\n<div>\n<p>These sites, along with level crossings at Church Street, Hart Street, Armstrong Street, Cants Road, Colac-Ballarat Road, Flaxmill Road, Colac-Forrest Road \/ Queen Street and Pyles Road, are now ready for the introduction of VLocity trains on the line later this year.<\/p>\n<\/div>\n<div>\n<p>The works provided an economic boost to Colac and the surrounding region, with workers using local accommodation, cafes, bakeries and restaurants during construction.<\/p>\n<\/div>\n<div>\n<p>The remaining 17 of 53 level crossing upgrades on the Warrnambool Line are being completed while coaches replace trains on the line until late August.<\/p>\n<p>Other works set to occur on the Warrnambool includes the 2.2 kilometres of new track for the Boorcan crossing loop improves service reliability. These works will allow a fifth weekday return service for residents.<\/p>\n<p>Learn more about the\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/warrnambool-line-upgrade\">Warrnambool Line Upgrade<\/a>.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/level-crossing-upgrades-complete-for-colac\/\">Level crossing upgrades complete for Colac<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/07\/RRR_GELU_Colac-LX.jpg\" alt=\"\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p>Level crossings in and around Colac have received an upgrade to prepare for the introduction of modern and accessible VLocity \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/level-crossing-upgrades-complete-for-colac\/\">Level crossing upgrades complete for Colac<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,879,163,2537,10906],"tags":[5721,10376,8],"class_list":["post-85354","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-level-crossing-removal","category-rail-industry-news-australia-new-zealand","category-signalling","category-signalling-communications","tag-level-crossings","tag-rail-express","tag-victoria"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Image\/Victoria&#039;s Big BuildLevel crossings in and around Colac have received an upgrade to prepare for the introduction of modern and accessible VLocity \u2026 The post Level crossing upgrades complete for Colac appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=85354\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Level crossing upgrades complete for Colac - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Image\/Victoria&#039;s Big BuildLevel crossings in and around Colac have received an upgrade to prepare for the introduction of modern and accessible VLocity \u2026 The post Level crossing upgrades complete for Colac appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=85354\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-07-11T22:26:34+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-07-11T22:26:34+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Level crossing upgrades complete for Colac - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Image\/Victoria&#039;s Big BuildLevel crossings in and around Colac have received an upgrade to prepare for the introduction of modern and accessible VLocity \u2026 The post Level crossing upgrades complete for Colac appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354#blogposting\",\"name\":\"Level crossing upgrades complete for Colac - VibeWire Magazine\",\"headline\":\"Level crossing upgrades complete for Colac\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-07-12T08:26:34+10:00\",\"dateModified\":\"2024-07-12T08:26:34+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354#webpage\"},\"articleSection\":\"Industry Infrastructure, Level Crossing Removal, Rail industry news (Australia, New Zealand), Signalling, Signalling &amp; Communications, Level Crossings, Rail Express, victoria\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354#listItem\",\"name\":\"Level crossing upgrades complete for Colac\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354#listItem\",\"position\":3,\"name\":\"Level crossing upgrades complete for Colac\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354\",\"name\":\"Level crossing upgrades complete for Colac - VibeWire Magazine\",\"description\":\"Image\\\/Victoria's Big BuildLevel crossings in and around Colac have received an upgrade to prepare for the introduction of modern and accessible VLocity \\u2026 The post Level crossing upgrades complete for Colac appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=85354#mainImage\"},\"datePublished\":\"2024-07-12T08:26:34+10:00\",\"dateModified\":\"2024-07-12T08:26:34+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Level crossing upgrades complete for Colac - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Level crossing upgrades complete for Colac - VibeWire Magazine","description":"Image\/Victoria's Big BuildLevel crossings in and around Colac have received an upgrade to prepare for the introduction of modern and accessible VLocity \u2026 The post Level crossing upgrades complete for Colac appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=85354","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=85354#blogposting","name":"Level crossing upgrades complete for Colac - VibeWire Magazine","headline":"Level crossing upgrades complete for Colac","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-07-12T08:26:34+10:00","dateModified":"2024-07-12T08:26:34+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=85354#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=85354#webpage"},"articleSection":"Industry Infrastructure, Level Crossing Removal, Rail industry news (Australia, New Zealand), Signalling, Signalling &amp; Communications, Level Crossings, Rail Express, victoria"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=85354#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=85354#listItem","name":"Level crossing upgrades complete for Colac"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=85354#listItem","position":3,"name":"Level crossing upgrades complete for Colac","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=85354\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=85354\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=85354#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=85354#webpage","url":"https:\/\/www.vibewire.com.au\/?p=85354","name":"Level crossing upgrades complete for Colac - VibeWire Magazine","description":"Image\/Victoria's Big BuildLevel crossings in and around Colac have received an upgrade to prepare for the introduction of modern and accessible VLocity \u2026 The post Level crossing upgrades complete for Colac appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=85354#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=85354\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=85354#mainImage"},"datePublished":"2024-07-12T08:26:34+10:00","dateModified":"2024-07-12T08:26:34+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Level crossing upgrades complete for Colac - VibeWire Magazine","og:description":"Image\/Victoria's Big BuildLevel crossings in and around Colac have received an upgrade to prepare for the introduction of modern and accessible VLocity \u2026 The post Level crossing upgrades complete for Colac appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=85354","article:published_time":"2024-07-11T22:26:34+00:00","article:modified_time":"2024-07-11T22:26:34+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Level crossing upgrades complete for Colac - VibeWire Magazine","twitter:description":"Image\/Victoria's Big BuildLevel crossings in and around Colac have received an upgrade to prepare for the introduction of modern and accessible VLocity \u2026 The post Level crossing upgrades complete for Colac appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"85354","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-24 23:29:14","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-03-22 06:13:01","updated":"2025-08-24 23:29:14"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tLevel crossing upgrades complete for Colac\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Level crossing upgrades complete for Colac","link":"https:\/\/www.vibewire.com.au\/?p=85354"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/85354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=85354"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/85354\/revisions"}],"predecessor-version":[{"id":85355,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/85354\/revisions\/85355"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=85354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=85354"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=85354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}