{"id":84076,"date":"2024-07-10T17:53:24","date_gmt":"2024-07-10T07:53:24","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=84076"},"modified":"2024-07-10T17:53:53","modified_gmt":"2024-07-10T07:53:53","slug":"premier-jacinta-allen-says-melbourne-airport-rail-link-wont-launch-in-the-next-decade","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=84076","title":{"rendered":"Premier Jacinta Allen says Melbourne Airport Rail Link won\u2019t launch in the next decade"},"content":{"rendered":"\n<p>Premier Jacinta Allan has shot down any hope that Victorians could be boarding a train to Melbourne Airport by 2030 despite an apparent compromise by the airport boss.<\/p>\n\n\n\n<p>Ms Allan on Monday failed to guarantee the long-awaited train line will built in the next decade, claiming the airport\u2019s \u201cunreasonable demands\u201d about its terminal station over four years had caused immeasurable delays.&nbsp;<\/p>\n\n\n\n<p>It comes after Melbourne Airport chief executive, Lorie Argus, confirmed it would back down from its preference to build the station underground.<\/p>\n\n\n\n<p>\u201cThis is a project that has been delayed by four years because of those frustrating negotiations that pretty much stalled last year,\u201d she said.&nbsp;<\/p>\n\n\n\n<p>\u201cThe construction timeline we outlined back in 2019 was a very aggressive one \u2026 (and) the completion date there was 2029.<\/p>\n\n\n\n<p>\u201cHere we are in 2024 with years of delay caused by the airport\u2019s ongoing insistence for a more costly \u2026 underground station solution.\u201d<\/p>\n\n\n\n<p>Ms Allan also flagged that it was unlikely the original $10 billion budget for the project would be enough.<\/p>\n\n\n\n<p>\u201cWith delay does come cost and so this will be something the Commonwealth government will need to work through,\u201d she said.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/04\/cc2106675dd2bf3a93dfc9e629f144de.jpeg\" alt=\"\" class=\"wp-image-26073\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/04\/cc2106675dd2bf3a93dfc9e629f144de.jpeg 1024w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/04\/cc2106675dd2bf3a93dfc9e629f144de-300x225.jpeg 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/04\/cc2106675dd2bf3a93dfc9e629f144de-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>There are hopes the rail link will get back on track.<\/p>\n\n\n\n<p>The Premier said Ms Argus sent her a message late last night to let her know about the change in position before sending her a formal email this morning.&nbsp;<\/p>\n\n\n\n<p>Ms Allan said further negotiations were needed between the state and federal government and Melbourne Airport to kickstart the project.&nbsp;<\/p>\n\n\n\n<p>Ms Argus said she was prepared to compromise and accept an&nbsp;<a href=\"https:\/\/www.heraldsun.com.au\/news\/victoria\/new-mediator-neil-scales-tasked-with-ending-melbourne-airport-rail-link-wars\/news-story\/09602900590043a3254590bfba249ffe\">elevated station<\/a>&nbsp;because it was time to get on with building the vital project.&nbsp;<\/p>\n\n\n\n<p>\u201cVictorians have waited long enough for an airport rail line,\u201d she said.&nbsp;<\/p>\n\n\n\n<p>\u201cWe will work with the Victorian Government to deliver their preferred above-ground station at the airport so the rail line can become reality.\u201d<\/p>\n\n\n\n<p>Ms Argus said passenger numbers were set to soar at Tullamarine this decade, in the lead up to a third runway being added to the site by 2030, and more transport options were needed.&nbsp;<\/p>\n\n\n\n<p>\u201cWith an estimated 45 million travellers a year predicted to be using our airport when the third runway opens, the rail link will support a massive increase in passenger numbers and billions of dollars in additional economic activity for Victoria,\u201d she said.<\/p>\n\n\n\n<p>Herald Sun Extract<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Premier Jacinta Allan has shot down any hope that Victorians could be boarding a train to Melbourne Airport by 2030 despite airport bosses putting an end to the long-running dispute.<\/p>\n","protected":false},"author":20,"featured_media":79118,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[513,47],"tags":[8898,993,8],"class_list":["post-84076","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-melbourne-airport","category-rail-news","tag-airport-rail","tag-melbourne","tag-victoria"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/84076","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=84076"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/84076\/revisions"}],"predecessor-version":[{"id":84078,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/84076\/revisions\/84078"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/79118"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=84076"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=84076"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=84076"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}