{"id":7843,"date":"2024-02-02T11:39:22","date_gmt":"2024-02-02T01:39:22","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=7843"},"modified":"2024-02-02T11:39:24","modified_gmt":"2024-02-02T01:39:24","slug":"slow-train-to-baxter-goes-slower-than-ever","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=7843","title":{"rendered":"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Greater Frankston and Mornington Peninsula residents will be stuck with a second-rate suburban rail service after Labor axed the much-needed Frankston to Baxter rail electrification project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The decision to pull long-standing funding for the project follows years of inaction by the Victorian Labor Government.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project would have replaced the infrequent diesel trains, improving service to thousands of residents in the growing suburb of Langwarrin and those down along the Mornington Peninsula.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It would have also relieved commuter pressures on Frankston Station, as well as providing greater access to the Frankston Hospital and Monash University\u2019s Peninsula Campus.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Shadow Minister for Public Transport, Matthew Guy, said: \u201cLabor is fixated on building a $50 billion tunnel from Cheltenham to Box Hill, neglecting important upgrades across our least serviced communities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThis Victorian Labor government has dragged its feet on this project and the federal government has called it quits and pulled the funding.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cToday the Premier Jacinta Allan told Parliament that her government was \u201cbuilding the road and rail connections that our city and state need\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cBut what\u2019s clear is that Jacinta Allan is not listening to the residents of greater Frankston and she simply can\u2019t manage major projects.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Source: https:\/\/vic.liberal.org.au\/news\/2023-11-16-slow-train-to-baxter-goes-slower-than-ever<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Greater Frankston and Mornington Peninsula residents will be stuck with a second-rate suburban rail service after Labor axed the much-needed Frankston to Baxter rail electrification project.<\/p>\n","protected":false},"author":20,"featured_media":7844,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[51,163,47,488],"tags":[],"class_list":["post-7843","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-passenger-rail","category-rail-industry-news-australia-new-zealand","category-rail-news","category-railway-stations"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Greater Frankston and Mornington Peninsula residents will be stuck with a second-rate suburban rail service after Labor axed the much-needed Frankston to Baxter rail electrification project.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"gobstopper\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=7843\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Greater Frankston and Mornington Peninsula residents will be stuck with a second-rate suburban rail service after Labor axed the much-needed Frankston to Baxter rail electrification project.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=7843\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-02-02T01:39:22+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-02-02T01:39:24+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Greater Frankston and Mornington Peninsula residents will be stuck with a second-rate suburban rail service after Labor axed the much-needed Frankston to Baxter rail electrification project.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843#blogposting\",\"name\":\"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER - VibeWire Magazine\",\"headline\":\"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=20#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/1600px-Baxter_railway_station_Melbourne_2010.jpg\",\"width\":1600,\"height\":900},\"datePublished\":\"2024-02-02T11:39:22+10:00\",\"dateModified\":\"2024-02-02T11:39:24+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843#webpage\"},\"articleSection\":\"passenger rail, Rail industry news (Australia, New Zealand), Rail News, Railway Stations\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843#listItem\",\"name\":\"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843#listItem\",\"position\":3,\"name\":\"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=20#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=20\",\"name\":\"gobstopper\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/edfb9eed042fb9f8994142e82aa8e900db86f4e6c1213d86473dd1251c9dffc7?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"gobstopper\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843\",\"name\":\"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER - VibeWire Magazine\",\"description\":\"Greater Frankston and Mornington Peninsula residents will be stuck with a second-rate suburban rail service after Labor axed the much-needed Frankston to Baxter rail electrification project.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=20#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=20#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/1600px-Baxter_railway_station_Melbourne_2010.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843\\\/#mainImage\",\"width\":1600,\"height\":900},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=7843#mainImage\"},\"datePublished\":\"2024-02-02T11:39:22+10:00\",\"dateModified\":\"2024-02-02T11:39:24+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER - VibeWire Magazine","description":"Greater Frankston and Mornington Peninsula residents will be stuck with a second-rate suburban rail service after Labor axed the much-needed Frankston to Baxter rail electrification project.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=7843","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=7843#blogposting","name":"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER - VibeWire Magazine","headline":"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=20#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/1600px-Baxter_railway_station_Melbourne_2010.jpg","width":1600,"height":900},"datePublished":"2024-02-02T11:39:22+10:00","dateModified":"2024-02-02T11:39:24+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=7843#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=7843#webpage"},"articleSection":"passenger rail, Rail industry news (Australia, New Zealand), Rail News, Railway Stations"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=7843#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=7843#listItem","name":"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=7843#listItem","position":3,"name":"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=7843\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=7843\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=20#author","url":"https:\/\/www.vibewire.com.au\/?author=20","name":"gobstopper","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=7843#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/edfb9eed042fb9f8994142e82aa8e900db86f4e6c1213d86473dd1251c9dffc7?s=96&d=mm&r=g","width":96,"height":96,"caption":"gobstopper"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=7843#webpage","url":"https:\/\/www.vibewire.com.au\/?p=7843","name":"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER - VibeWire Magazine","description":"Greater Frankston and Mornington Peninsula residents will be stuck with a second-rate suburban rail service after Labor axed the much-needed Frankston to Baxter rail electrification project.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=7843#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=20#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=20#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/1600px-Baxter_railway_station_Melbourne_2010.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=7843\/#mainImage","width":1600,"height":900},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=7843#mainImage"},"datePublished":"2024-02-02T11:39:22+10:00","dateModified":"2024-02-02T11:39:24+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER - VibeWire Magazine","og:description":"Greater Frankston and Mornington Peninsula residents will be stuck with a second-rate suburban rail service after Labor axed the much-needed Frankston to Baxter rail electrification project.","og:url":"https:\/\/www.vibewire.com.au\/?p=7843","article:published_time":"2024-02-02T01:39:22+00:00","article:modified_time":"2024-02-02T01:39:24+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER - VibeWire Magazine","twitter:description":"Greater Frankston and Mornington Peninsula residents will be stuck with a second-rate suburban rail service after Labor axed the much-needed Frankston to Baxter rail electrification project.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"7843","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-05-20 17:00:47","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-02-02 01:39:24","updated":"2026-05-20 17:00:47"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tSLOW TRAIN TO BAXTER GOES SLOWER THAN EVER\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"SLOW TRAIN TO BAXTER GOES SLOWER THAN EVER","link":"https:\/\/www.vibewire.com.au\/?p=7843"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/7843","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7843"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/7843\/revisions"}],"predecessor-version":[{"id":7845,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/7843\/revisions\/7845"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/7844"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7843"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7843"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7843"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}